Jumba Engineering Two Rivers Mall Testing and Inspection (1)

Project Snap Shot

Challenge

Complex mixed-use footprint required complete verification of earthing and LPS.

Solution

Grid testing (3-point/4-point), down-conductor continuity, bonding audit, SPD coordination review.

Outcome

Documented safe pathways to ground; corrective punch list; lower surge risk.